All Products
Contact Person :
wang
Phone Number :
+8615051978734
JINYIEP Floor Mounted Activated Carbon Regeneration Machine OEM ODM
Power Source: | Electricity |
---|---|
Regeneration Efficiency: | 95% |
Installation: | Floor-mounted |
Rotary Kiln Dryer Rotary Kiln Electric Furnace For Cement Production
Packaging Details: | Wooden Case,plywood Case,pallet Etc. |
---|---|
Delivery Time: | about 15-45 days, accordingly |
Payment Terms: | D/A, T/T, L/C,D/P |
Bag Dust Collector Bag Dust Removal Machine For Industrial Particulate Emissions
Voltage: | 220V |
---|---|
Application: | Industrial Dust Removal |
Filter Type: | Bag Filter |
OEM ODM Custom Quench Tower Cooling Tower For Metallurgy
Packaging Details: | Wooden Case,plywood Case,pallet Etc. |
---|---|
Delivery Time: | about 15-45 days, accordingly |
Payment Terms: | D/A, T/T, L/C,D/P |
Quench Column Quenching Tower For Petroleum Refining / Chemical Manufacturing
Used For: | Petroleum Refining, Chemical Manufacturing, Power Generation, And Metallurgy. |
---|---|
Packaging Details: | Wooden Case,plywood Case,pallet Etc. |
Delivery Time: | about 15-45 days, accordingly |
Heat Recovery Boiler Waste Heat Boiler For Cement Production
Packaging Details: | Wooden Case,plywood Case,pallet Etc. |
---|---|
Delivery Time: | about 15-45 days, accordingly |
Payment Terms: | D/A, T/T, L/C,D/P |
Waste Heat Recovery Boiler For Petroleum Refining / Steel Manufacturing
Used In: | Power Generation, Petroleum Refining, Chemical Production, Steel Manufacturing, And Cement Production |
---|---|
Packaging Details: | Wooden Case,plywood Case,pallet Etc. |
Delivery Time: | about 15-45 days, accordingly |
Post Combustion Chambers Used For waste incineration plants
Packaging Details: | Wooden Case,plywood Case,pallet Etc. |
---|---|
Delivery Time: | about 15-45 days, accordingly |
Payment Terms: | D/A, T/T, L/C,D/P |
Above 900 Degrees Industrial High Temp Heat Exchanger Machine
Packaging Details: | Wooden Case,plywood Case,pallet Etc. |
---|---|
Delivery Time: | about 15-45 days, accordingly |
Payment Terms: | D/A, T/T, L/C,D/P |
OEM ODM High Temperature Heat Exchanger Corrosion Resistant
Packaging Details: | Wooden Case,plywood Case,pallet Etc. |
---|---|
Delivery Time: | about 15-45 days, accordingly |
Payment Terms: | D/A, T/T, L/C,D/P |